Year 2015

Tourism and leisure harbour upstream Port Corabia area Cod CPV 45241000-8 Port Construction Works (Rev.2), consisting of:

1. Land arrangement works(clearing existing vegetation and brush, topsoil stripping);
2. Dredging for achieving miniport;
3. Earthworks;
4. Outdoor protective harbor with piers up to +3.00 versus 0 etiage local port Corabia;
5. Routing mol up to +3.00 versus 0 etiage local port Corabia;

Beneficiary: City of CORABIA

Performer: SC Superquatro Grup SRL

Execution time: 03.2015 –

 

Year 2014

Maintenance work for hydrotechnical constructions in Crisan area Mm 14+00-Mm 12+454 -Mm 12+628, right shore, Obretin area Mm 14+1500 - Mm 14+1310, right shore, Gorgova area Mm 22+015 - Mm 21+1629, Mm 21+1229-Mm 21+1229-Mm 21+239, roght shore, lot 2 

Beneficiary: Administratia Fluviala a Dunarii de Jos RA Galati

Performer: SC Superquatro Grup SRL

Execution time: 07.2014 – 11.2014

 

“The navigation improvement conditions on danube river between calarasi and braila and complementary measures - Stage 1” 

The hydrotechnical works (elimination of critical clauses in accordance with the requirements from the draft contract) deploy in two points:

  • Critical point Ostrovu Lupu: threshold of full load and defenses from the shore;
  • Critical point Epurasu: dump sub routing to waters and defenses from the shore

Beneficiary: Administratia Fluviala a Dunarii de Jos RA Galati

Performer: SC Superquatro Grup SRL

Execution time: 02.08.2011 – may.2014

 

Year 2012

“The navigation improvement conditions on danube river between calarasi and braila and complementary measures - Stage 1” 

The hydrotechnical works (elimination of critical clauses in accordance with the requirements from the draft contract) deploy in two points:

  • Critical point Ostrovu Lupu: threshold of full load and defenses from the shore;
  • Critical point Epurasu: dump sub routing to waters and defenses from the shore

Beneficiary: Administratia Fluviala a Dunarii de Jos RA Galati

Performer: SC Superquatro Grup SRL

Execution time: 02.08.2011 – may.2014

 

Maintenance work for hydrotechnical constructions at Sulina Hm 73+00-Hm 76+70, South and North Far Decking, Obretin zone mm 16+1100-15+050

Beneficiary: I.R.C.H. Tulcea 

Performer: SC Superquatro Grup SRL

Execution time: 13.08.2012 – 29.11.2012

 

Year 2011

“The navigation improvement conditions on danube river between calarasi and braila and complementary measures - Stage 1” 

The hydrotechnical works (elimination of critical clauses in accordance with the requirements from the draft contract) deploy in two points:

  • Critical point Ostrovu Lupu: threshold of full load and defenses from the shore;
  • Critical point Epurasu: dump sub routing to waters and defenses from the shore

Beneficiary: Administratia Fluviala a Dunarii de Jos RA Galati

Performer: SC Superquatro Grup SRL

Execution time: 02.08.2011 – may.2014

 

Maintenance work for hydrotechnical constructions at Sulina Hm 40+46, South and North Far Decking, the Crisan zone 11+500-Mm 22+450, Gorgova zone Mm 21+1629-Mm 21+1229 square border

Beneficiary: Administratia Fluviala a Dunarii de Jos RA Galati 

Performer: SC Superquatro Grup SRL

Execution time: 16.05.2011 – 07.12.2011

 

Year 2010

Maintenance work for hydrotechnical constructions at Sulina , South and North Far Decking, the Partizani-Papadia zone Mm 28+171- Mm 27+1173, left border

Beneficiary: I.R.C.H. Tulcea

Performer: SC Superquatro Grup SRL

Execution time: 20.07.2010 – 11.11.2010

 

Maintenance work for hydrotechnical constructions at Maliuc-Vulturu ,Mm 26+550- Mm 26+650, left border

Beneficiary: I.R.C.H. S.A. Tulcea

Performer: SC Superquatro Grup SRL

Execution time: 11.11.2010 – 03.12.2010

 

Year 2009

Restore damaged bank protection in the cliff related to Tulcea Municipality between profiles P41 downstream + 6m – P43 downstream + 4m

Beneficiary: CN Administratia Porturilor Dunarii Maritime SA Galati

Performer: SC Superquatro Grup SRL

Execution time: 15.01.2009 – 01.08.2013

 

Maintenance works hydro construction in areas such as Sulina , Obretin and Galati (Dana 16, Dana 3, 8, 9, left bank)

Beneficiary: I.R.C.H. Tulcea

Performer: SC Superquatro Grup SRL

Execution time: 17.09.2009 – 23.01.2010