Year 2012
“The navigation improvement conditions on danube river between calarasi and braila and complementary measures - Stage 1”
The hydrotechnical works (elimination of critical clauses in accordance with the requirements from the draft contract) deploy in two points:
- Critical point Ostrovu Lupu: threshold of full load and defenses from the shore;
- Critical point Epurasu: dump sub routing to waters and defenses from the shore
Beneficiary: Administratia Fluviala a Dunarii de Jos RA Galati
Performer: SC Superquatro Grup SRL
Execution time: 02.08.2011 – may.2014
Maintenance work for hydrotechnical constructions at Sulina Hm 73+00-Hm 76+70, South and North Far Decking, Obretin zone mm 16+1100-15+050
Beneficiary: I.R.C.H. Tulcea
Performer: SC Superquatro Grup SRL
Execution time: 13.08.2012 – 29.11.2012
Year 2011
“The navigation improvement conditions on danube river between calarasi and braila and complementary measures - Stage 1”
The hydrotechnical works (elimination of critical clauses in accordance with the requirements from the draft contract) deploy in two points:
- Critical point Ostrovu Lupu: threshold of full load and defenses from the shore;
- Critical point Epurasu: dump sub routing to waters and defenses from the shore
Beneficiary: Administratia Fluviala a Dunarii de Jos RA Galati
Performer: SC Superquatro Grup SRL
Execution time: 02.08.2011 – may.2014
Maintenance work for hydrotechnical constructions at Sulina Hm 40+46, South and North Far Decking, the Crisan zone 11+500-Mm 22+450, Gorgova zone Mm 21+1629-Mm 21+1229 square border
Beneficiary: Administratia Fluviala a Dunarii de Jos RA Galati
Performer: SC Superquatro Grup SRL
Execution time: 16.05.2011 – 07.12.2011
Year 2010
Maintenance work for hydrotechnical constructions at Sulina , South and North Far Decking, the Partizani-Papadia zone Mm 28+171- Mm 27+1173, left border
Beneficiary: I.R.C.H. Tulcea
Performer: SC Superquatro Grup SRL
Execution time: 20.07.2010 – 11.11.2010
Maintenance work for hydrotechnical constructions at Maliuc-Vulturu ,Mm 26+550- Mm 26+650, left border
Beneficiary: I.R.C.H. S.A. Tulcea
Performer: SC Superquatro Grup SRL
Execution time: 11.11.2010 – 03.12.2010
Year 2009
Restore damaged bank protection in the cliff related to Tulcea Municipality between profiles P41 downstream + 6m – P43 downstream + 4m
Beneficiary: CN Administratia Porturilor Dunarii Maritime SA Galati
Performer: SC Superquatro Grup SRL
Execution time: 15.01.2009 – 01.08.2013
Maintenance works hydro construction in areas such as Sulina , Obretin and Galati (Dana 16, Dana 3, 8, 9, left bank)
Beneficiary: I.R.C.H. Tulcea
Performer: SC Superquatro Grup SRL
Execution time: 17.09.2009 – 23.01.2010