Dredges on the Danube river between km 279-km 283 Capidava, km 275-km 276, Albanesti  

Beneficiary: Administratia Fluviala a Dunarii de Jos RA Galati 

Performer: SC Superquatro Grup SRL

Estimated quantitaty: 60.000 mc

Execution time: 08.2014 – 12.2014

 

Dredges on critical point Bala - Turcescu - Caragheorghe (between km 346+500 - km 347+800 ) for enhancing and deepening of the fairway for a estimated quantitaty of 312,193 mcrh 

Beneficiary: Administratia Fluviala a Dunarii de Jos RA Galati 

Performer: SC Superquatro Grup SRL

Estimated quantitaty: 312.193 mcrh

Execution time: 12.2013 – 10.2014

Year 2015

Tourism and leisure harbour upstream Port Corabia area Cod CPV 45241000-8 Port Construction Works (Rev.2), consisting of:

1. Land arrangement works(clearing existing vegetation and brush, topsoil stripping);
2. Dredging for achieving miniport;
3. Earthworks;
4. Outdoor protective harbor with piers up to +3.00 versus 0 etiage local port Corabia;
5. Routing mol up to +3.00 versus 0 etiage local port Corabia;

Beneficiary: City of CORABIA

Performer: SC Superquatro Grup SRL

Execution time: 03.2015 –

 

Year 2014

Maintenance work for hydrotechnical constructions in Crisan area Mm 14+00-Mm 12+454 -Mm 12+628, right shore, Obretin area Mm 14+1500 - Mm 14+1310, right shore, Gorgova area Mm 22+015 - Mm 21+1629, Mm 21+1229-Mm 21+1229-Mm 21+239, roght shore, lot 2 

Beneficiary: Administratia Fluviala a Dunarii de Jos RA Galati

Performer: SC Superquatro Grup SRL

Execution time: 07.2014 – 11.2014

 

“The navigation improvement conditions on danube river between calarasi and braila and complementary measures - Stage 1” 

The hydrotechnical works (elimination of critical clauses in accordance with the requirements from the draft contract) deploy in two points:

  • Critical point Ostrovu Lupu: threshold of full load and defenses from the shore;
  • Critical point Epurasu: dump sub routing to waters and defenses from the shore

Beneficiary: Administratia Fluviala a Dunarii de Jos RA Galati

Performer: SC Superquatro Grup SRL

Execution time: 02.08.2011 – may.2014

 

  • Beneficiary: CN Administratia Porturilor Dunarii Maritime SA Galati
  • General Contractor: SC Navrom Shipyard SRL Galati
  • Performer: SC Superquatro Grup SRL Galati
  • Execution time: 03.08.2012 – 11.11.2013

 